<%@LANGUAGE="JAVASCRIPT" CODEPAGE="1252"%> Waste Recycling Group Arpley - B & M Solutions
B & M Solutions Logo  
Home   Environmental Care   Our People   Contact B&M Solutions
tel: 01248 355996 email info@bmps.co.uk
Search start search
Site Navigation
Contracting & Project Management
Landfill Gas Extraction Systems
Project Sheets - Lanfill Gas Extraction Systems
Leachate Extraction Systems
Project Sheets - Leachate Extraction System
B & M Lining Systems
Bauku
Telescopic Shafts - Bauku
Sidewall Risers - Bauku
Sewer Systems - Bauku
Tanks & Vessels - Bauku
Retro-Drill Telescopic Well Liners
HDPE Fabrication
Sentinel Pneumatic Pump
System Design & Consultancy

 

 
Welcome to B & M Solutions
 


Large Diameter Butt Fusion Welding.

Welding 630mm main
Project Duration: 16 days

B&M Solutions Ltd. were contracted to weld and install a 2000m 630mm ring main. All pipe work was welded using Trackstar Butt Fusion equipment as shown in the photo (right).

The pipe work was surface laid and a 1m flight auger was used to install 7 knock out pots along the 2 kilometre line. In addition to the knock out pots 8 x 630mm Tee’s were installed, these were fabricated and supplied by our workshops in Bethesda.

This project was significant in terms of the large diameter and quantity of welded and installed within a restrictive time scale.



trench preperation
 
 
Contracting & Project Management - Landfill Gas Extraction Systems - Leachate Extraction Systems - Bauku Telescopic Shafts
Retro-drill Telescopic Well Liner - HDPE Fabrication - Sentinel Pneumatic Pump - System Design & Consultancy

Registered in England & Wales Company No. 04429085